Sirjan Gas Engine Power Plant
Sirjan Gas Engine Power Plant include 13 Gas Engines in the Sirjan Economy Zone. The electricity generated in this power plant is for power supply to the area and part of generated steam use for greenhouse, pool, and vegetable oil factory near the power plant. Energy Gostaran Sahand has been awarded two contracts from United Energy Developers, EPC contractor of Sirjan Gas Engine Power Plant, as below:
Mobilization, civil & building and installation of mechanical, electrical & instrument of :
The subject of contract include mobilization, civil & building and installation of mechanical, electrical & instrument for Sirjan Gas Engine Power Plant consist of 13 Gas Engines which has a capacity of 2MW each with total of 26MW with the following activities:
Installation and Commissioning of Gas Engines and CHP
Installation and Commissioning of main transformer with capacity of 2500KVA and auxiliary transformer with capacity of 1600KVA
Construction of administrative building, switchgear building and control room with related auxiliaries
Lighting systems for gas engines hall, control room, MV and LV halls, security guard & administration building and the area
Execute HVAC and air supplying for input and output generator hall, piping, insulation, painting, earthling, surge arrester system, fire alarm system, DC system, cable and cable trays.
Installation and Commissioning of MV and LV panels
Local Procurement of Material and Equipment:
Following are important items which included in the contract:
Electrical switchgears and Panels – 20 KV / 400V AC.
Battery Charger , Inverter, UPS – 400VAC/110VDC – 2*100% - 65A
MV / LV and Control Cables – 20KV and 1KV – 20 Km Length.
Ladder and Cable Tray and accessories – Hot Deep Galvanized – 20 Ton Weight
Air Intake & Exhaust Fan – 2*36000 m3/h and 1*57000 m
CHP (Heat Exchanger) – 2*22.1 m
Scada System – V-RTU2000 and V-WLAN2000
Insulation Transformer – 1*1.6 MVA and 2*2.5 MVA
Septic Tank – 12000 Liters
material - about 1000 m
Sahand Energy Development also supplied items such as Lighting System, Earthing and Lightning System - Telephone and Paging System, Bulk Material (conduit, support,...) , Electrical Bulk Material (Relay,...), Instrument Material (Transducer, …) and Piping & Fitting and etc.